Burlington City High School

Client: Burlington City Board of Education
Location: Burlington, NJ

MMA provided Programming, Master Planning, Architecture and Interior Design Services for Major Addition and Renovations to the Burlington City High School. This 57,000 square foot addition and 150,000 sq. ft renovation project for the Grade 7 through 12 Junior High/High School includes a new state of the art media center, approximately 30 new classrooms, increased administrative space as well as renovations to the cafeteria, music wing and 80% of existing classrooms to meet FES requirements.  The media center is defined by a curved & tilted glass structure with brick and metal facades as a backdrop.

The entire facility now includes a new intercom and clock system, technology requirements, fire alarm, & sprinkler.  All of the existing windows were replaced to address the life-safety/maintenance issues.  The majority of roof areas were also revitalized as a direct impact of installing the new steel structure to support all new rooftop HVAC units.  New ceilings, pendant light fixtures, and doors were also installed in the renovated areas. The existing football field and track were removed and replaced with two practice fields and a baseball field.

SERVICES

Architectural Design
Master Planning
Sustainable Design/ LEED
Preliminary Design
Schematic Design
Interior Design
Design Development
Construction Documentation
Construction Administration
Rendering
Marketing

NJSBA Workshop 2019

Atlantic City Convention Center
Atlantic City, NJ

We’re going to be at the NJSBA Workshop 2019 and would like to meet with you. We’re working with a variety of Educational clients in the Tri State area and given the opportunity, would like to show you what we can do.

21-24

October 2019

Scroll to Top

THOMAS P. MCHUGH

Principal

RA, AIA, NCARB

During his tenure at the New Jersey Institute of Technology and after earning his Bachelor of Architecture, Tom has spent close to Thirty Years in planning, design, construction and contract administration for a wide range of large and small-scale projects. He joined the company in early 1997 and as one of MMA’s Principals, he has been responsible for overseeing the growth and success of the educational design studio for the last two decades. His responsibilities include contract generation, establishing budgets for hard and soft costs, design consultant coordination, and overseeing construction administration and project close-out. Tom attributes his success to his attention to detail, and his ability to work effectively with all stakeholders.